Impact Energy Services Inc.

Retro-Commissioning (RCx)

What is Retro-Commissioning and why is it important?

RCx is a systematic quality assurance process used to review operations of existing facilities with the objective of bringing building systems back to their original design intent. 

The purpose of RCx a building:

  1. Improve the building’s energy efficiency through low-cost, no-cost operational improvements (mostly control changes) while maintaining required Indoor Air Quality
  2. Find and repair operational issues to restore building to original performance
  3. Educate and train building operators and maintenance staff how to monitor and analyze building performance data to ensure the equipment is running optimally

RCx facts:

  1. A number of studies have shown that RCx buildings can lead to significant energy savings, between 5 to 30%
  2. Simple payback ranging from 3 months to 3 years
  3. A number of measures addressed by RCx relate to our inability to control the building operations 

RCx Presentation - Impact Energy Services.pdf RCx Presentation - Impact Energy Services.pdf
Size : 3335.426 Kb
Type : pdf

Impact Energy Services provides assorted services for retro-commissioning buildings and the systems that operate them.

Contact us today for a free evaluation for your property by dialing 1-800-496-8698.

© 2011 Energy Audits & Management – Retro-Commissioning, Project Management Monitoring & Targeting for Commercial, Industrial & Multi-Unit Toronto, Ontario